Explore over 500,000 Images in my personal collection
|
- Code Number:
- CCBV01P05_13.1514
- Title:
-
Vancouver, Lions Gate Bridge, First Narrows Bridge, Highways 99 and 1A, suspension bridge
- Carries: Three lanes of British Columbia Highway 99/1A, pedestrians and bicycles
Crosses: Burrard Inlet Maintenance: British Columbia Ministry of Transportation Designer: Monsarrat and Pratley Clearance below: 61 m (200 feet) Construction began: 31/03/1937 Opened: 14/11/1938 Daily traffic: 60,000 - 70,000 cars Total length: 1,823 meters (5,890 feet) Height: 111 m Longest span: 472 m (1,550 feet) Load limit: 13 tonnes (14.3 tons) Coordinates: 49?18 55 N 123?8 18 W, Carries: Three lanes of British Columbia Highway 99/1A, pedestrians and bicycles Crosses: Burrard Inlet Maintenance: British Columbia Ministry of Transportation Designer: Monsarrat and Pratley Clearance below: 61 m (200 feet) Construction began: 31/03/1937 Opened: 14/11/1938 Total length: 1,823 meters (5,890 feet) Height: 111 m Longest span: 472 m (1,550 feet) Load limit: 13 tonnes (14.3 tons) Daily traffic: 60,000 - 70,000 cars Opened: 1938
- Keywords:
-
Bridge, Crossing, Span, British Columbia, Canada, Architecture, Structure, Scenic, Canadian, North America, Province, History, Archives
- Image by:
- Wernher Krutein
|
- Code Number:
- CCBV01P05_13.1514
- Title:
-
Vancouver, Lions Gate Bridge, First Narrows Bridge, Highways 99 and 1A, suspension bridge
- Carries: Three lanes of British Columbia Highway 99/1A, pedestrians and bicycles
Crosses: Burrard Inlet
Maintenance: British Columbia Ministry of Transportation
Designer: Monsarrat and Pratley
Clearance below: 61 m (200 feet)
Construction began: 31/03/1937
Opened: 14/11/1938
Daily traffic: 60,000 - 70,000 cars
Total length: 1,823 meters (5,890 feet)
Height: 111 m
Longest span: 472 m (1,550 feet)
Load limit: 13 tonnes (14.3 tons)
Coordinates: 49?18 55 N 123?8 18 W, Carries: Three lanes of British Columbia Highway 99/1A, pedestrians and bicycles
Crosses: Burrard Inlet
Maintenance: British Columbia Ministry of Transportation
Designer: Monsarrat and Pratley
Clearance below: 61 m (200 feet)
Construction began: 31/03/1937
Opened: 14/11/1938
Total length: 1,823 meters (5,890 feet)
Height: 111 m
Longest span: 472 m (1,550 feet)
Load limit: 13 tonnes (14.3 tons)
Daily traffic: 60,000 - 70,000 cars
Opened: 1938
- Keywords:
-
Bridge, Crossing, Span, British Columbia, Canada, Architecture, Structure, Scenic, Canadian, North America, Province, History, Archives
- Image by:
- Wernher Krutein
- Caption Disclaimer
Buy Print: