Carries: Three lanes of British Columbia Highway 99/1A, pedestrians and bicycles Crosses: Burrard Inlet Maintenance: British Columbia Ministry of Transportation Designer: Monsarrat and Pratley Clearance below: 61 m (200 feet) Construction began: 31/03/1937 Opened: 14/11/1938 Total length: 1,823 meters (5,890 feet) Height: 111 m Longest span: 472 m (1,550 feet) Load limit: 13 tonnes (14.3 tons) Daily traffic: 60,000 - 70,000 cars Opened: 1938
Carries: Three lanes of British Columbia Highway 99/1A, pedestrians and bicycles Crosses: Burrard Inlet Maintenance: British Columbia Ministry of Transportation Designer: Monsarrat and Pratley Clearance below: 61 m (200 feet) Construction began: 31/03/1937 Opened: 14/11/1938 Total length: 1,823 meters (5,890 feet) Height: 111 m Longest span: 472 m (1,550 feet) Load limit: 13 tonnes (14.3 tons) Daily traffic: 60,000 - 70,000 cars Opened: 1938