Explore over 500,000 Images in my personal collection
Adjustable Blade Turbines, Rocky Reach Dam, Chelan - Douglas counties, Washington
Code Number:
TPHV02P04_07B
Title:
Adjustable Blade Turbines, Rocky Reach Dam, Chelan - Douglas counties, Washington
Dam: Rocky Reach Dam, Columbia River, River Mile 473.7
Construction began: 1956 (Phase One), 1969 (Phase Two)
Construction cost $273.1 million
Creates: Lake Entiat
Owner: Chelan County PUD No. 1
Turbines: 11
Spillway: 12 gates
Installed capacity: 1299.6 MW
Normal Full Pool: 707.0 feet
Normal Low Pool: 703.0 feet
Powerhouse Capacity:
Nameplate capacity 1: 7 @ 117 MW, 4 @ 132 MW, 1347 MW total
Peak capacity 1: 1287 MW total
Hydraulic capacity: 220 kcfs
A state-of-the-art juvenile fish bypass was built across the dam in 2003
Keywords:
Hydroelectric Power, Potable Water, Structure, Generating, Generation, Electricity, Technology, Energy Production, Electrical, Industrial, Industry, Alternative, Renewable Resource, Cleantech, Hydrology, waterpower, Hydropower, Irrigation, Hydraulics
Adjustable Blade Turbines, Rocky Reach Dam, Chelan - Douglas counties, Washington
BUY IMAGE(S) NOW
Code Number:
TPHV02P04_07B
Title:
Adjustable Blade Turbines, Rocky Reach Dam, Chelan - Douglas counties, Washington
Dam: Rocky Reach Dam, Columbia River, River Mile 473.7
Construction began: 1956 (Phase One), 1969 (Phase Two)
Construction cost $273.1 million
Creates: Lake Entiat
Owner: Chelan County PUD No. 1
Turbines: 11
Spillway: 12 gates
Installed capacity: 1299.6 MW
Normal Full Pool: 707.0 feet
Normal Low Pool: 703.0 feet
Powerhouse Capacity:
Nameplate capacity 1: 7 @ 117 MW, 4 @ 132 MW, 1347 MW total
Peak capacity 1: 1287 MW total
Hydraulic capacity: 220 kcfs
A state-of-the-art juvenile fish bypass was built across the dam in 2003
Keywords:
Hydroelectric Power, Potable Water, Structure, Generating, Generation, Electricity, Technology, Energy Production, Electrical, Industrial, Industry, Alternative, Renewable Resource, Cleantech, Hydrology, waterpower, Hydropower, Irrigation, Hydraulics
Caption Disclaimer

Royalty Free: Calculate Price

279 x 418 pixels This image size immediately available after purchase 2 PhotoPoints $6.00
801 x 1200 pixels This image size immediately available after purchase 3 PhotoPoints $9.00
1569 x 2350 pixels This image size available in 3 hours after purchase 24 PhotoPoints $72.00
3605 x 5400 pixels This image size available in 3 hours after purchase 60 PhotoPoints $180.00
Ultra Hi for larger output size, please call customer service 415-720-9928
DSI, Ataturk Dam, Euphrates River, Turkey, Transmission Towers, PylonsKaplan Turbine, Rotor Turbine, Salto Grande Hydroelectric Plant, Salto Grande Bi-National Hydroelectric Centra, SaltoKaplan Turbine, Rotor Turbine, Salto Grande Hydroelectric Plant, Salto Grande Bi-National Hydroelectric Centra, SaltoFrancis Turbine, Itapu Dam, Itaipu Dam, Brazil, ParaguayAdjustable Blade Turbines, Rocky Reach Dam, Chelan - Douglas counties, WashingtonAdjustable Blade Turbines, Rocky Reach Dam, Chelan - Douglas counties, WashingtonRocky Reach Dam, Chelan - Douglas counties, WashingtonRocky Reach Dam, Chelan - Douglas counties, WashingtonRocky Reach Dam, Chelan - Douglas counties, WashingtonRocky Reach Dam, Chelan - Douglas counties, WashingtonRocky Reach Dam, Chelan - Douglas counties, WashingtonRocky Reach Dam, Chelan - Douglas counties, WashingtonGrand Coulee Dam, cars, Columbia River, Gravity Dam, 1950sRoosevelt Dam, Vintage, 1974, 1970sRoosevelt Dam, Vintage, 1974, 1970sRoosevelt Dam, 1974, 1970s
Go to lightbox