Explore over 500,000 Images in my personal collection
|
- < PREV | NEXT >
-
- Code Number:
- TSWV09P12_03
- Title:
-
Freighter, Cape Cod Canal, Massachusetts, Cape Cod Canal Railroad Bridge, Lift Bridge, Bourne
- Maintained by: United States Army Corps of Engineers
Design: Lift bridge Longest span: 166 meters (544 feet) Clearance below: 41 meters (35 feet) (raised) Beginning date of construction: 1933 Opening date: December 29, 1935
- Keywords:
-
Bridge, Crossing, Span, Workboats, Maritime, Commerce, Transportation, Technology, business, freightage, hauling, shipment, transit, transporting, transshipment, industrial, industry, Freighter, working, boat, Vessel, Commercial-Shipping, Freight, Ship, Cargo, History, Archives, Mariner, Fleet, hull, travel, Commercial, Shipping, merchant
|
- Code Number:
- TSWV09P12_03
- Title:
-
Freighter, Cape Cod Canal, Massachusetts, Cape Cod Canal Railroad Bridge, Lift Bridge, Bourne
- Maintained by: United States Army Corps of Engineers
Design: Lift bridge
Longest span: 166 meters (544 feet)
Clearance below: 41 meters (35 feet) (raised)
Beginning date of construction: 1933
Opening date: December 29, 1935
- Keywords:
-
Bridge, Crossing, Span, Workboats, Maritime, Commerce, Transportation, Technology, business, freightage, hauling, shipment, transit, transporting, transshipment, industrial, industry, Freighter, working, boat, Vessel, Commercial-Shipping, Freight, Ship, Cargo, History, Archives, Mariner, Fleet, hull, travel, Commercial, Shipping, merchant
- Caption Disclaimer