Explore over 500,000 Images in my personal collection
|
- < PREV | NEXT >
-
- Code Number:
- TPHV02P04_08
- Title:
-
Rocky Reach Dam, Chelan - Douglas counties, Washington
- Dam: Rocky Reach Dam, Columbia River, River Mile 473.7
Construction began: 1956 (Phase One), 1969 (Phase Two) Construction cost $273.1 million Creates: Lake Entiat Owner: Chelan County PUD No. 1 Turbines: 11 Spillway: 12 gates Installed capacity: 1299.6 MW Normal Full Pool: 707.0 feet Normal Low Pool: 703.0 feet Powerhouse Capacity: Nameplate capacity 1: 7 @ 117 MW, 4 @ 132 MW, 1347 MW total Peak capacity 1: 1287 MW total Hydraulic capacity: 220 kcfs A state-of-the-art juvenile fish bypass was built across the dam in 2003
- Keywords:
-
Hydroelectric Power, Potable Water, Structure, Generating, Generation, Electricity, Technology, Energy Production, Electrical, Industrial, Industry, Alternative, Renewable Resource, Cleantech, Hydrology, waterpower, Hydropower, Irrigation, Hydraulics
|
- Code Number:
- TPHV02P04_08
- Title:
-
Rocky Reach Dam, Chelan - Douglas counties, Washington
- Dam: Rocky Reach Dam, Columbia River, River Mile 473.7
Construction began: 1956 (Phase One), 1969 (Phase Two)
Construction cost $273.1 million
Creates: Lake Entiat
Owner: Chelan County PUD No. 1
Turbines: 11
Spillway: 12 gates
Installed capacity: 1299.6 MW
Normal Full Pool: 707.0 feet
Normal Low Pool: 703.0 feet
Powerhouse Capacity:
Nameplate capacity 1: 7 @ 117 MW, 4 @ 132 MW, 1347 MW total
Peak capacity 1: 1287 MW total
Hydraulic capacity: 220 kcfs
A state-of-the-art juvenile fish bypass was built across the dam in 2003
- Keywords:
-
Hydroelectric Power, Potable Water, Structure, Generating, Generation, Electricity, Technology, Energy Production, Electrical, Industrial, Industry, Alternative, Renewable Resource, Cleantech, Hydrology, waterpower, Hydropower, Irrigation, Hydraulics
- Caption Disclaimer