Explore over 500,000 Images in my personal collection
USS Enterprise (CVN-65), Alameda Naval Air Station, NAS, USN, 4 March 1984, 1980s
Code Number:
MYNV02P09_17.1702
Title:
USS Enterprise (CVN-65), Alameda Naval Air Station, NAS, USN, 4 March 1984, 1980s
Ordered: 15/11/1957
Laid down: 04/02/1958
Launched: 24/09/1960
Christened: 24/09/1960
Acquired: 29/10/1961
Commissioned: 25/11/1961
In service: 12/01/1962 (maiden voyage)
Out of service: 01/12/2012
Decommissioned: 15/03/2013
Struck: 3 February 2017
Reclassified: CVN-65
Builder: Newport News Shipbuilding and Drydock Company
Cost: $451.3 million
Displacement: 93,284 long tons (94,781 tons) Full Load
Length: 342 meters (1,123 feet)
Beam: 40.5 meters (132.8 feet) (waterline)
78.4 meters (257.2 feet) (extreme)
Draft: 12 meters (39 feet)
Propulsion: 8 Westinghouse A2W nuclear reactors
4x Westinghouse geared steam turbines, 4 shafts
280,000 shp (210 MW)
Speed: 33.6 knots (38.7 mph; 62.2 km/h)
Range: Unlimited; 20-25 years

Complement: 5,828 (maximum)
Ship's company: 3,000 (2,700 Sailors, 150 Chiefs, 150 Officers)
Air wing: 1,800 (250 pilots, and 1,550 support personnel)
Sensors and processing systems: AN/SPS-48 3D air search radar
AN/SPS-49 2D air search radar
Electronic warfare and decoys: AN/SLQ-32
Mark 36 SRBOC
Armament: 2 NATO Sea Sparrow launchers
2 20 mm Phalanx CIWS mounts
2x RAM launchers
Armor: 20 cm (8 inch) aluminum belt (equivalent to 10 cm (4 inch) rolled homogeneous steel armor), Armored flight deck, hangar, magazines and reactor
Aircraft carried: Holds up to 90, 60+ (normally)
Aviation facilities: Flight deck: 342 meters (1,123 feet)
Nickname: Big E
Notes: 4x steam powered catapults
Keywords:
Antennas, communications, Telecom, Telecommunications, Antena, Antenae, Technology, Navigation, Transmitter, electronics, Radar, San Francisco Bay Area, California, USA, Aircraft Carrier, Vessel, Ship, Hull, Warship, Flatop, USS Enterprise, CVN-65, Nuclear Powered aircraft Carrier, United States Navy, USN, Navy, Military, Armament, Killingry, Weaponry, warfare, Naval, Weapon, Maritime, History, Archives, Historic, Armed Force
Image by:
Wernher Krutein
USS Enterprise (CVN-65), Alameda Naval Air Station, NAS, USN, 4 March 1984, 1980s
BUY IMAGE(S) NOW
Code Number:
MYNV02P09_17.1702
Title:
USS Enterprise (CVN-65), Alameda Naval Air Station, NAS, USN, 4 March 1984, 1980s
Ordered: 15/11/1957
Laid down: 04/02/1958
Launched: 24/09/1960
Christened: 24/09/1960
Acquired: 29/10/1961
Commissioned: 25/11/1961
In service: 12/01/1962 (maiden voyage)
Out of service: 01/12/2012
Decommissioned: 15/03/2013
Struck: 3 February 2017
Reclassified: CVN-65
Builder: Newport News Shipbuilding and Drydock Company
Cost: $451.3 million
Displacement: 93,284 long tons (94,781 tons) Full Load
Length: 342 meters (1,123 feet)
Beam: 40.5 meters (132.8 feet) (waterline)
78.4 meters (257.2 feet) (extreme)
Draft: 12 meters (39 feet)
Propulsion: 8 Westinghouse A2W nuclear reactors
4x Westinghouse geared steam turbines, 4 shafts
280,000 shp (210 MW)
Speed: 33.6 knots (38.7 mph; 62.2 km/h)
Range: Unlimited; 20-25 years

Complement: 5,828 (maximum)
Ship's company: 3,000 (2,700 Sailors, 150 Chiefs, 150 Officers)
Air wing: 1,800 (250 pilots, and 1,550 support personnel)
Sensors and processing systems: AN/SPS-48 3D air search radar
AN/SPS-49 2D air search radar
Electronic warfare and decoys: AN/SLQ-32
Mark 36 SRBOC
Armament: 2 NATO Sea Sparrow launchers
2 20 mm Phalanx CIWS mounts
2x RAM launchers
Armor: 20 cm (8 inch) aluminum belt (equivalent to 10 cm (4 inch) rolled homogeneous steel armor), Armored flight deck, hangar, magazines and reactor
Aircraft carried: Holds up to 90, 60+ (normally)
Aviation facilities: Flight deck: 342 meters (1,123 feet)
Nickname: Big E
Notes: 4x steam powered catapults
Keywords:
Antennas, communications, Telecom, Telecommunications, Antena, Antenae, Technology, Navigation, Transmitter, electronics, Radar, San Francisco Bay Area, California, USA, Aircraft Carrier, Vessel, Ship, Hull, Warship, Flatop, USS Enterprise, CVN-65, Nuclear Powered aircraft Carrier, United States Navy, USN, Navy, Military, Armament, Killingry, Weaponry, warfare, Naval, Weapon, Maritime, History, Archives, Historic, Armed Force
Image by:
Wernher Krutein
Caption Disclaimer

Royalty Free: Calculate Price

418 x 296 pixels This image size immediately available after purchase 2 PhotoPoints $6.00
1200 x 850 pixels This image size immediately available after purchase 5 PhotoPoints $15.00
2350 x 1665 pixels This image size immediately available after purchase 33 PhotoPoints $99.00
5400 x 3824 pixels This image size available in 3 hours after purchase 81 PhotoPoints $243.00
Ultra Hi for larger output size, please call customer service 415-720-9928
A-4 Skyhawk, 4 March 1984154505, 402, Vought, A-7 Corsair II, Alameda Naval Air Station, Bay Bridge, Transamerica, 4 March 1984Vought A-7 Corsair II, Alameda Naval Air Station, NAS, USN, 4 March 1984634, Alameda Naval Air Station, Douglas A-3D Skywarrior, NAS, USN, 4 March 1984Alameda Naval Air Station, San Francisco Oakland Bay Bridge, Transamerica Pyramid, NAS, USN, 4 March 1984USS Enterprise (CVN-65), Alameda Naval Air Station, NAS, USN, 4 March 1984, 1980sA-4 SkyhawkA-4 SkyhawkSan Francisco Oakland Bay Bridge, USS Enterprise (CVN-65), Coit Tower, Transamerica Pyramid, March 1984, 1980sSan Francisco Oakland Bay Bridge, USS Enterprise (CVN-65), March 1984, 1980sUSS Enterprise (CVN-65), March 1984, 1980sUSS Enterprise (CVN-65), March 1984, 1980sUSS Enterprise (CVN-65), March 1984, 1980sUSS Enterprise (CVN-65), March 1984, 1980sUSS Enterprise (CVN-65), March 1984, 1980sUSS Enterprise (CVN-65), March 1984, 1980s
Go to lightbox