Location: Navajo Nation, near Page, Arizona Commission date: 1974, 1975, 1976 Owners: U.S. Bureau of Reclamation (24.3%), Salt River Project (21.7%), Los Angeles Dept. of Water and Power (21.2%), Arizona Public Service (14.0%), NV Energy (11.3%), Tucson Electric Power (7.5%) Operator: Salt River Project Generation units: 3 Installed capacity: 2250 MW
Location: Navajo Nation, near Page, Arizona Commission date: 1974, 1975, 1976 Owners: U.S. Bureau of Reclamation (24.3%), Salt River Project (21.7%), Los Angeles Dept. of Water and Power (21.2%), Arizona Public Service (14.0%), NV Energy (11.3%), Tucson Electric Power (7.5%) Operator: Salt River Project Generation units: 3 Installed capacity: 2250 MW