Explore over 500,000 Images in my personal collection
|
- < PREV | NEXT >
-
- Code Number:
- CSBD01_106
- Title:
-
High Street Bridge, Double-leaf Bascule Drawbridge, Truss, Rainy, Crosses Oakland Estuary, Alameda
- Span: 296 feet
Designed by: County of Alameda Surveyors Office Constructed under the Federal WPA Program in 1939 Cost: $750,000 Opens approximately 1400 times per year Carries: 26,000 vehicles per year
- Keywords:
-
Bridge, Crossing, Span, SF-Bay Area, California, Architecture, Travel, Scenics, Structure, historical
- Image by:
- Wernher Krutein
|
- Code Number:
- CSBD01_106
- Title:
-
High Street Bridge, Double-leaf Bascule Drawbridge, Truss, Rainy, Crosses Oakland Estuary, Alameda
- Span: 296 feet
Designed by: County of Alameda Surveyors Office
Constructed under the Federal WPA Program in 1939
Cost: $750,000
Opens approximately 1400 times per year
Carries: 26,000 vehicles per year
- Keywords:
-
Bridge, Crossing, Span, SF-Bay Area, California, Architecture, Travel, Scenics, Structure, historical
- Image by:
- Wernher Krutein
- Caption Disclaimer