Explore over 500,000 Images in my personal collection
C-GITS, Airbus A330-243, Rolls Royce Trent 772B, This is the aircraft that had to glide 85 nautical miles with no fuel
Code Number:
TAFV31P06_04
Title:
C-GITS, Airbus A330-243, Rolls Royce Trent 772B, This is the aircraft that had to glide 85 nautical miles with no fuel
CN: 271
First flight: 1999
Engines: 2x Rolls Royce Trent 772B
Accident Report:
Status: Final
Date: 24 AUG 2001
Time: 06:45 UTC
Total airframe hrs: 10433
Cycles: 2390
Crew: Fatalities: 0 / Occupants: 13
Passengers: Fatalities: 0 / Occupants: 293
Total: Fatalities: 0 / Occupants: 306
Airplane damage: Substantial
Airplane fate: Repaired
Location: Terceira-Lajes AFB, Azores (LFB) (Portugal)
Phase: En route (ENR)
Nature: International Scheduled Passenger
Departure airport: Toronto-Pearson International Airport, ON (YYZ/CYYZ), Canada
Destination airport: Lisboa-Portela de Sacav?m Airport (LIS/LPPT), Portugal
Flight number: 236
Narrative:
Air Transat Flight TS236, was en route at FL390 when at 05:36 UTC, the crew became aware of a fuel imbalance between the left and right-wing main fuel tanks. Five minutes later the crew concerned about the lower-than-expected fuel quantity indication, decided to divert to Lajes Airport in the Azores. At 05:48 UTC, when the crew ascertained that a fuel leak could be the reason for the possible fuel loss, an emergency was declared to Santa Maria Oceanic Control. At 06:13, at a calculated distance of 135 miles from Lajes, the right engine (Rolls-Royce Trent 772B) flamed out. At 06:26, when the aircraft was about 85 nm from Lajes and at an altitude of about FL345, the left engine flamed out. At 06:39 the aircraft was at 13,000 feet and 8 miles from the threshold of runway 33. An engines-out visual approach was carried out and the aircraft landed on runway 33. Eight of the plane's ten tyres burst during the landing.
Investigation has determined that a low-pressure fuel line on the right engine, had failed probably as the result of its coming into contact with an adjacent hydraulic line.
FINDINGS AS TO CAUSES AND CONTRIBUTING FACTORS:
1. The replacement engine was received in an unexpected pre-SB arrangement to which the operator had not previously been exposed.
2. Neither the engine-receipt nor the engine-change planning process identified the differences in arrangement between the engine being removed and the engine being installed, leaving complete reliance for detecting the differences upon the technicians doing the engine change.
3. The lead technician relied on verbal advice during the engine change procedure rather than acquiring access to the relevant SB, which was necessary to properly complete the installation of the post-mod hydraulic pump.
4. The installation of the post-mod hydraulic pump and the post-mod fuel tube with the pre-mod hydraulic tube assembly resulted in a mismatch between the fuel and hydraulic tubes.
5. The mismatched installation of the pre-mod hydraulic tube and the post-mod fuel tube resulted in the tubes coming into contact with each other, which resulted in the fracture of the fuel tube and the fuel leak, the initiating event that led to fuel exhaustion.
6. Although the existence of the optional Rolls-Royce SB RB.211-29-C625 became known during the engine change, the SB was not reviewed during or following the installation of the hydraulic pump, which negated a safety defence that should have prevented the mismatched installation.
7. Although a clearance between the fuel tube and hydraulic tube was achieved during installation by applying some force, the pressurization of the hydraulic line forced the hydraulic tube back to its natural position and eliminated the clearance.
8. The flight crew did not detect that a fuel problem existed until the Fuel ADV advisory was displayed and the fuel imbalance was noted on the Fuel ECAM page.
9. The crew did not correctly evaluate the situation before taking action.
10. The flight crew did not recognize that a fuel leak situation existed and carried out the fuel imbalance procedure from memory, which resulted in the fuel from the left tanks being fed to the leak in the right engine.
11. Conducting the FUEL IMBALANCE procedure by memory negated the defence of the Caution note in the FUEL IMBALANCE checklist that may have caused the crew to consider timely actioning of the FUEL LEAK procedure.
12. Although there were a other indications that a significant fuel loss was occurring, the crew did not conclude that a fuel leak situation existed ? not actioning the FUEL LEAK procedure was the key factor that led to the fuel exhaustion.
Follow-up / safety actions:
Since the occurrence, on 29 August 2001, Rolls-Royce issued a World Wide Communication
(DBY/CS/00697/2001). advising operators, in part, to check all engines to ensure that adequate clearance exists between the fuel and hydraulic line. A Non modification service bulletin is to be issued to formalise this inspection, and will be rendered mandatory by the Bristish Civil Aviation Authority.

On 29 August 2001, Airbus issued an All Operators Telex (AOT) A330-73A3033 requiring a one-time visual inspection to verify that no interference exists between the fuel and hydraulic lines on all A330 aircraft equipped with Rolls-Royce 700 series engines. This inspection must be done at the earliest convenient
opportunity within 72 hours elapsed time from the reception of the AOT.
Keywords:
Airbus, A330, Twin aisle, Wide Body Jet, Widebody, Fixed wing multi engine, multi-engine, Turbofan, Jetliner, wide-body, Vancouver International Airport (YVR), British Columbia, Canada, Air Transat A.T. Inc., Airlines, Plane, Avion, History, Technology, Fleet, Livery, Equipment, hull, Public, Airframe, Transport, Fixed-Wing, Commerce, Travel, Airplane, Archive, Airline, Aerospace, Civil Transportation, Passenger Aircraft, Commercial Aviation, Airliner
Image by:
Gordon Tan
C-GITS, Airbus A330-243, Rolls Royce Trent 772B, This is the aircraft that had to glide 85 nautical miles with no fuel
BUY IMAGE(S) NOW
Code Number:
TAFV31P06_04
Title:
C-GITS, Airbus A330-243, Rolls Royce Trent 772B, This is the aircraft that had to glide 85 nautical miles with no fuel
CN: 271
First flight: 1999
Engines: 2x Rolls Royce Trent 772B
Accident Report:
Status: Final
Date: 24 AUG 2001
Time: 06:45 UTC
Total airframe hrs: 10433
Cycles: 2390
Crew: Fatalities: 0 / Occupants: 13
Passengers: Fatalities: 0 / Occupants: 293
Total: Fatalities: 0 / Occupants: 306
Airplane damage: Substantial
Airplane fate: Repaired
Location: Terceira-Lajes AFB, Azores (LFB) (Portugal)
Phase: En route (ENR)
Nature: International Scheduled Passenger
Departure airport: Toronto-Pearson International Airport, ON (YYZ/CYYZ), Canada
Destination airport: Lisboa-Portela de Sacav?m Airport (LIS/LPPT), Portugal
Flight number: 236
Narrative:
Air Transat Flight TS236, was en route at FL390 when at 05:36 UTC, the crew became aware of a fuel imbalance between the left and right-wing main fuel tanks. Five minutes later the crew concerned about the lower-than-expected fuel quantity indication, decided to divert to Lajes Airport in the Azores. At 05:48 UTC, when the crew ascertained that a fuel leak could be the reason for the possible fuel loss, an emergency was declared to Santa Maria Oceanic Control. At 06:13, at a calculated distance of 135 miles from Lajes, the right engine (Rolls-Royce Trent 772B) flamed out. At 06:26, when the aircraft was about 85 nm from Lajes and at an altitude of about FL345, the left engine flamed out. At 06:39 the aircraft was at 13,000 feet and 8 miles from the threshold of runway 33. An engines-out visual approach was carried out and the aircraft landed on runway 33. Eight of the plane's ten tyres burst during the landing.
Investigation has determined that a low-pressure fuel line on the right engine, had failed probably as the result of its coming into contact with an adjacent hydraulic line.
FINDINGS AS TO CAUSES AND CONTRIBUTING FACTORS:
1. The replacement engine was received in an unexpected pre-SB arrangement to which the operator had not previously been exposed.
2. Neither the engine-receipt nor the engine-change planning process identified the differences in arrangement between the engine being removed and the engine being installed, leaving complete reliance for detecting the differences upon the technicians doing the engine change.
3. The lead technician relied on verbal advice during the engine change procedure rather than acquiring access to the relevant SB, which was necessary to properly complete the installation of the post-mod hydraulic pump.
4. The installation of the post-mod hydraulic pump and the post-mod fuel tube with the pre-mod hydraulic tube assembly resulted in a mismatch between the fuel and hydraulic tubes.
5. The mismatched installation of the pre-mod hydraulic tube and the post-mod fuel tube resulted in the tubes coming into contact with each other, which resulted in the fracture of the fuel tube and the fuel leak, the initiating event that led to fuel exhaustion.
6. Although the existence of the optional Rolls-Royce SB RB.211-29-C625 became known during the engine change, the SB was not reviewed during or following the installation of the hydraulic pump, which negated a safety defence that should have prevented the mismatched installation.
7. Although a clearance between the fuel tube and hydraulic tube was achieved during installation by applying some force, the pressurization of the hydraulic line forced the hydraulic tube back to its natural position and eliminated the clearance.
8. The flight crew did not detect that a fuel problem existed until the Fuel ADV advisory was displayed and the fuel imbalance was noted on the Fuel ECAM page.
9. The crew did not correctly evaluate the situation before taking action.
10. The flight crew did not recognize that a fuel leak situation existed and carried out the fuel imbalance procedure from memory, which resulted in the fuel from the left tanks being fed to the leak in the right engine.
11. Conducting the FUEL IMBALANCE procedure by memory negated the defence of the Caution note in the FUEL IMBALANCE checklist that may have caused the crew to consider timely actioning of the FUEL LEAK procedure.
12. Although there were a other indications that a significant fuel loss was occurring, the crew did not conclude that a fuel leak situation existed ? not actioning the FUEL LEAK procedure was the key factor that led to the fuel exhaustion.
Follow-up / safety actions:
Since the occurrence, on 29 August 2001, Rolls-Royce issued a World Wide Communication
(DBY/CS/00697/2001). advising operators, in part, to check all engines to ensure that adequate clearance exists between the fuel and hydraulic line. A Non modification service bulletin is to be issued to formalise this inspection, and will be rendered mandatory by the Bristish Civil Aviation Authority.

On 29 August 2001, Airbus issued an All Operators Telex (AOT) A330-73A3033 requiring a one-time visual inspection to verify that no interference exists between the fuel and hydraulic lines on all A330 aircraft equipped with Rolls-Royce 700 series engines. This inspection must be done at the earliest convenient
opportunity within 72 hours elapsed time from the reception of the AOT.
Keywords:
Airbus, A330, Twin aisle, Wide Body Jet, Widebody, Fixed wing multi engine, multi-engine, Turbofan, Jetliner, wide-body, Vancouver International Airport (YVR), British Columbia, Canada, Air Transat A.T. Inc., Airlines, Plane, Avion, History, Technology, Fleet, Livery, Equipment, hull, Public, Airframe, Transport, Fixed-Wing, Commerce, Travel, Airplane, Archive, Airline, Aerospace, Civil Transportation, Passenger Aircraft, Commercial Aviation, Airliner
Image by:
Gordon Tan
Caption Disclaimer

Royalty Free: Calculate Price

418 x 279 pixels This image size immediately available after purchase 2 PhotoPoints $6.00
1200 x 801 pixels This image size immediately available after purchase 5 PhotoPoints $15.00
2350 x 1569 pixels This image size available in 3 hours after purchase 36 PhotoPoints $108.00
5400 x 3605 pixels This image size available in 3 hours after purchase 90 PhotoPoints $270.00
Ultra Hi for larger output size, please call customer service 415-720-9928
HB-IPV, Airbus A319-112, SwissAir, A319 series, CFM56-5B6/P, CFM56HB-IJH, Airbus A320-214, SwissAir, CFM56-5B4-P, CFM56C-FYLC, Airbus A340-313X, Air Canada ACA, CFM56-5C4, CFM56C-FYLD, Airbus A340-313X, Air Canada ACA, Toronto, Canada, CFM56-5C4, CFM56, Clara CampoamorC-FYLD, Airbus A340-313X, Air Canada ACA, Toronto, Canada, CFM56-5C4, CFM56, Clara Campoamor, Taking-off, Flight, Flying, AirborneC-GITS, Airbus A330-243, Rolls Royce Trent 772B, This is the aircraft that had to glide 85 nautical miles with no fuel9V-SJM, Airbus A340-313X, Singapore Airlines SIA, CELESTAR, A340-300 series, Celestar, taking-offF-GHPJ, Airbus A340-313X, Philippine Airlines PAL, CFM56-5C4, CFM-56, CFM56B-HXI, Cathay Pacific, Airbus A340HS-TEG, Airbus A330-321, Thai Airways THA, Lam Plai Mat, A330-300 seriesD-AIGU, Airbus A340-313X, Lufthansa, Castrop-Rauxel, A340-300 seriesD-AERK, Airbus A330-322, LTUHB-JMG, Airbus A340-313X, SwissAir, CFM56-5C4, CFM56D-ACLO, Bombardier-Canadair Regional Jet CRJ-100LR, Lufthansa CitylineD-ACJH, Canadair CRJ-100LR, Lufthansa CitylineD-ACJH, Canadair CRJ-100LR, Lufthansa Cityline