Explore over 500,000 Images in my personal collection
|
- Code Number:
- ICCV09P04_10B
- Title:
-
Al Zampa Memorial Bridge, Carquinez Bridge, Tower Crane, Panorama, Interstate Highway I-80
- Stats for the new Suspension Bridge:
Structural Steel 12,722,000 Kg (14,000 T) Cable Steel 4,600,000 Kg (5,060 T) Structural Concrete 26,580 M3 (31,770 CY) Reinforcing Steel 4,662,000 Kg (5,130 T) 3 M Concrete Piling 996 M (3,300 feet) 2.700 M Rock Socket 741 M (2,400 feet) Anchorage Piles 380 Ea Anchorage Piles 12,565 M (41,200 feet)
Owner: California DOT (Caltrans) Design: Caltrans Engineering Service Ctr. De Leuw - OPAC - Steinman JV Contractor: FCI / Cleveland Bridge
- Keywords:
-
Bridge, Crossing, Span, Construction Cranes, Heavy Equipment, Historical, Industry, Industrial, Commercial Construction
|